Head Contractor Case Study

How Construction Control saved 2,500+ hours on one project with SIMPEL

6 Brindabella Circuit, Canberra Airport

Construction Control company logo
Modern building with curved glass facade and large angled roof supported by tall pillars.
Highlights
  • Saved over 2,500 labour hours on this project alone
  • Savings increased to more than 5x that when rolled out across all projects

BEFORE SIMPEL

Construction Control were using a mix of paper-based forms and documents, excel spreadsheets, and email to keep track of their projects. As their projects grew in size and number, they identified the need for greater visibility and consistency to enhance productivity and reduce administration. Too much time was being spent archiving, tracking down files for audits and staying on top of areas like worker and plant inductions and certification.

Adopting SIMPEL

The need to centralise documents and communications, and to streamline overall operations became more pressing once the team hit the ceiling on their productivity. 

"We didn't feel like we were on top of the projects like we wanted to be and it was time for a change."

Donovan de Ligt
HSEQ Manager
Construction Control logo

Construction Control brought in Simpel to help them manage construction operations across $500m of their major projects. They implemented a range of modules including: Simpel Essentials, Safety Management, Site Access and Bookings. 

“Using Simpel’s platform to manage every project provides our head office with complete organisational oversight, where the status of every project can be viewed from a centralised system. The team can review and analyse data, extract project and organisational insights, and identify risks before they occur. As all documents, plans and forms are shared through the platform, it also becomes the project’s source of truth for workers who have permission to view the files.”

Broad uptake for users across the project

The broad and successful uptake of Simpel’s platform by the team, as well as contractors and subcontractors, is evident in the metrics.
Here are some of their stats at the time of publishing:

  • 1261 worker inductions
  • 155 plant inductions
  • 118 safety plans/SWMS
  • 394 bookings
  • 4978 documents
  • 915 forms
  • 325 RFIs
  • 65 tenders
  • 76 workflows

Over 2,500 hours saved by digitising SWMS and inductions

This was the first of Construction Control's projects to utilise Simpel’s SWMS/safety plan management and Site Safety module. With over 1,200 workers and 150+ plant items onsite, the impact of this module alone resulted in significant labour efficiencies.

By digitising and automating components of the SWMS and inductions processes for both plant and worker, the team measured the following time savings:

  • 1 hour per SWMS review
  • 4 hours for company HSEQ reviews
  • 1 hour per worker induction
  • 1 hour per plant permit

This amounted to over 2,500 hours saved across the whole project.

They also saved over 150 hours on plant inductions and reported that the Safety module streamlined their federal safety audits, making it easier for the team and the auditor to compile and review documentation.

Donovan said he and his team benefited from having more available time after introducing Simpel.

“With less paperwork and elimination of manual processing of SWMS and inductions, the team was able to get out on site much more often to work with subcontractors and improve safety outcomes for the project. Together with my team, this helped us lower incidents and we saw documented improvements in safety across all our construction sites.”

Hours saved on tower crane erections

As Construction Control had implemented a number of Simpel’s modules across their project, the erection of the tower crane became more streamlined. The SWMS/safety plan management could be easily integrated with worker inductions, license management, plant induction, risk assessment, safety inspections and eForms checklists, the consultations process and site access.

This resulted in at least 10-15 hours of time saved for the tower crane erection.

Over 15,000 hours saved across the business

“The time we’ve saved by introducing Simpel across the entire business and all projects amounts to over 15,000 hours saved per year across project teams and subcontractors. We’ve already seen improvements in our productivity and efficiency, and we can all see how continued integration with Simpel software will propel us to further growth in the future.”

Industry Recognition - Winners at 2021 MBA Awards

Gold circular badge for Master Builders and Asset Construction Hire 2021 Winner Excellence Awards.
Winner 2021 Master Builders ACT

Given the positive impact on safety outcomes at this project, Construction Control and Simpel co-entered the 2021 MBA Excellence awards hosted by Master Builders ACT and were awarded the 2021 award for WH&S Targeted Risk Management System.

“While the benefits and outcomes we gained from implementing Simpel across the business has been rewarding, receiving this industry recognition was a proud achievement. It was very exciting news for all involved with this fantastic project at the Canberra Airport Precinct. Sharing the win with Simpel is a clear demonstration of our excellent working relationship and passion to continually improve our industry.”

About Construction Control

Construction Control, is a construction and project management firm operating in the ACT, NSW, and QLD. They have delivered projects for Australia’s top ranked educational institutions, Commonwealth, State and Territory Governments, high profile commercial developers and some of Australia’s largest retail centres including Castle Towers and Westpoint.

Thanks to Donovan de Ligt and the team at Construction Control for their ongoing support and contribution to this case study.

How much time do you spend on repetitive admin?

See how Simpel can help you save hours every day with a unified approach to operations

Construction runs on documents, decisions and on-site execution. SIMPEL delivers all three, with its hardware as ground truth and a network that compounds with every project our clients deliver. Bolt AI runs in the background, keeping delivery focused on execution, not managing another layer of technology.

Illustrated top-down view of a tablet device surrounded by construction documents, plans, and project management icons

From design, delivery, and handover, SIMPEL brings construction operations into one connected system to turn information into action. By connecting teams onsite and in the office, it captures mission critical workflows and the rich data needed to power AI that distils meaningful intelligence.

Hand-drawn sketch of a construction site with cranes and a building under construction, overlaid with project charts and data dashboards

Reporting & Analytics supports precise, informed decision-making by automatically consolidating project and organisational data to create a live thread of interactive information.

Project Dashboards
Organisation Intelligence
OData Exports
Hand-drawn sketch of a warehouse facility with a delivery truck and storage shelving, representing on-site logistics and materials management

Bookings & Warehousing replaces the whiteboard, setting the rhythm of operations across resources, deliveries, and storage, keeping everything in sync from early bookings to last minute changes.

Bookings & Deliveries
Warehousing
Automated Cycles
Sketch of a full-height turnstile gate and access control barrier at a construction site entrance

SIMPEL’S proprietary site access hardware and software, developed as one cohesive system, mitigates the hazard of unknown, untrained, and non-compliant workers entering sites.

Site Access Dashboard
Zone Management
Evacuation Management
Workhour Reporting
Turnstile Gates
Vehicle Boom Gates
Tripod Turnstiles
Speed Gates
Biometric Systems
Tablet Kiosks & QR Posters
Illustration of a tablet kiosk on a stand displaying a site floor plan, with construction machinery visible in the background

Quality Management drives QA processes, using dynamic forms and workflows to manage audits, defects, and tasks, ensuring required actions are captured and addressed as they arise.

Customised QA Forms
QTrack Defecting
Inspection & Testing Plans
Task Management
Illustration of a construction worker wearing a hard hat and reviewing a tablet on a job site

This suite centralises safety processes to keep every site protected and compliant, putting the right tools in the hands of the people who need them most and supporting safe, well-coordinated worksites.

SIMPEL Passport
Workforce Compliance
Role-Based Inductions
Plant Management
RAMS
Prequalification
Safety Documents
Daily Declarations
Site Diaries
Incident Management
Visitor Management
HSE Observations
HSE Forms & Inspections
Site Notifications
Permits
CSCS Validation
Architectural sketch of a multi-storey building shown as a layered cross-section, with each floor representing a stage of construction delivery

Project Essentials centralises the core tools needed for delivery, unifying documents, data, and communications into one place so there’s always a clear view of what’s happening and what needs to be done next.

Document Management
Loop Reviews
BIM Viewer
Drawing Collaboration
Communication & RFIs
Tendering
EOT/Variations Registers
Information Delivery Plans
QR Docs
Workflows
Photos