CIVIL CONSTRUCTION CASE STUDY

JK Williams Left Point Solutions Behind and Reclaimed Hours Every Day with SIMPEL

Highlights
  • Replaced point solutions with a unified digital platform
  • Saved hours every day with streamlined operations
  • Rolled out SIMPEL across entire project portfolio
  • Enhanced audit readiness and ISO compliance with real-time data access
  • Empowered site teams with defined processes, intuitive workflows and mobile accessibility
Modules used

BEFORE SIMPEL:
BALANCING POINT SOLUTIONS

Before adopting SIMPEL, JK Williams used a mix of point solutions: Procore for quality, Sine for site access, and hard copy forms for everything else. It worked, but as the business grew, so did the time spent chasing paperwork and switching between systems.

Not having the content in one location that we could all go to and say ‘OK, here it is,’ made things harder. The security permissions weren’t great either. You either had access to everything or nothing.


Then we’d have our safety team trying to audit against ITPs, going around requesting the information we couldn’t find ourselves. And things like meeting minutes, if someone took them home, we couldn’t access them during audits. The oversight and accessibility just wasn’t there.

Jessica Gough
HSE Manager

Finding the Perfect Fit: The Evaluation Journey That Led to Simpel

The team had been exploring digital solutions for years but hadn’t found one that filled them with confidence—especially when it came to traceability and flexibility.

We spent many years talking about what our systems would look like on a digital platform. The biggest thing was our work method statements and how we could prove someone had actually signed them.

A lot of systems just gave you a signature with no profile and no link to a person. You’d pass a tablet around and hope for the best. We had to take photo proof just in case. That’s why we stayed away from digital for so long.
Nothing gave us the confidence that we could prove what we needed to. Then we saw SIMPEL and thought, ‘That meets all of our needs.’

Jessica Gough
HSE Manager

Having explored a slew of systems that didn’t quite deliver the full package, JK Williams approached SIMPEL with caution and a clear list of non-negotiables. The platform had to be practical, intuitive for site teams, and able to handle operational complexity without creating bottlenecks.

We had our list of priorities, and we could see that SIMPEL aligned with them. We still didn’t jump in straight away—we’d been burnt before. But once we’d built our workflows and trialled them on our first project, we very quickly realised this was the right fit for us.

Jessica Gough
HSE Manager

From Meetings to Machinery: Saving Hours. Every. Single. Day.

With SIMPEL in place, JK Williams has dramatically reduced time lost to repetitive admin tasks. Compliance, quality, and safety are easier to manage across the board. Toolbox talks, inspections, onboarding and plan reviews are faster, clearer, and easier to track. It’s been a measurable shift resulting in the team spending more time on the tools, and less time chasing paperwork.

Cutting Time Spent on Toolbox Talks by 60%

Toolbox talks are one of the biggest time savers. Instead of working off paper templates or chasing signatures after the fact, supervisors now use eForms that are linked directly to attendee profiles.

“We’ve been able to put what used to be a 45-minute meeting into around 15 to 20 minutes. We pre-fill a lot of it, the guys review it, and when they sign off it’s all tracked. They can refer back to what was discussed and we’re not having to explain it all over again.”

Two Hours Saved Per Piece of Plant

Plant onboarding, once a friction point, now happens before equipment even arrives. Subcontractors upload all required documentation in advance, giving the safety team time to review and approve everything without holding up work on site.

“It used to be that plant would arrive and then we’d start the onboarding. Now we’ve flipped it—everything’s submitted before they get here. That alone saves at least two hours per machine.”

Finding Tiny Drawing Notes in Seconds

Plan and drawing management have been transformed. Previously, identifying drawing updates meant combing through files to find small, handwritten notes. Drawing Collaboration provides instant clarity on changes.

“Trying to figure out where that sneaky little note had been written used to take ages. Now we just hit compare and it shows us exactly what’s changed. Our project managers don’t even have to think about it anymore. That’s huge and saves hours as well.”

Confirm Who’s on Site in Minutes

Daily site management is smoother and more precise. Supervisors can pull up real-time headcounts and contractor lists with just a few taps, eliminating manual tallying and guesswork.

“Just being able to bring up the list and say, ‘Alright, there should be 20 guys here’, and confirm it with a glance, that’s something we do every single day. It might not seem huge, but that time adds up.”

Stopped Digging for Data:
One View Into Every Project

SIMPEL's Project Dashboards automatically surface the data that matters most. From overdue actions to attendance and sign-offs, project managers and leadership can quickly see what needs attention without clicking through folders or shuffling through filing cabinets.

They’re not just a static snapshot. The dashboards update in real time, giving teams up-to-date insight into daily compliance and emerging trends, without the legwork. They’re also fully interactive. Users can click straight into overdue actions or items that need attention and close them out.

SIMPEL project dashboard showing safety metrics, compliance stats, and onsite compliance radar for workers and permits.

The project dashboard really changed things, it was leaps and bounds for the team. I honestly think most of my supervisors just open that one module. They don’t have to go looking through the platform, it’s all just there. Once they saw how easy it was to find what they needed, they didn’t want to go back.

Jessica Gough
HSE Manager

Auditing Becomes Effortless When The Evidence Is Already There

SIMPEL has also made it easier for JK Williams to demonstrate full operational compliance workflows. Auditors no longer need to jump between tabs or even visit sites, to verify sign-ons, meeting minutes, or corrective actions. Everything is connected, with evidence linked back to the original form, incident, or register. That visibility has helped the business prove, at a glance, that nothing has been missed.

Live Access Anywhere, Anytime

When the platform was first rolled out, JK Williams' auditor immediately noted the difference when they saw everything needed for review was live, linked, and right there in context.

For our auditor, when we first introduced it, he loved it. He can be here in NSW, and I’ll go, ‘You want to check out the Queensland site? Here’s who’s checked in. They’re signed onto their SWMS. Let’s go.’ We just link everything up. Who’s on site today? Check. Their induction? Check. It’s all there. And we can do it all from our desktop.

Jessica Gough
HSE Manager

There’s no more requesting files or chasing records. With one login, auditors can validate and confirm that every process is being followed and closed out.

In audit terms, it’s all about closing the loop. With SIMPEL, I can show the incident, the corrective action, the follow-up meeting, and the evidence—everything’s linked in one place. It’s a clear snapshot that shows we’ve done what we’re supposed to do.

Jessica Gough
HSE Manager

‍A Transparent Trail of Action and Accountability

Every part of the compliance process is now connected, and every gap is visible. If a signature is missing, if a meeting record hasn’t been logged, or if an action is still open, the system shows it.

There’s no hiding. Like if you haven’t done something you were meant to do in the system, you can’t go backwards. It’s there, so we have to deal with it… which also protects all our supervisors because if they are doing their daily checks, if they are making sure this is occurring, that does nothing but help them. Everything is traceable, and that’s exactly what we need. We’ve had much more thorough audits because of it. They’re not just ticking boxes. They’re reviewing what’s happening and actively reducing risks.

Jessica Gough
HSE Manager

‍Shaping Expectations, Not Just Meeting Them: A Platform That Earns Client Confidence

Since partnering with SIMPEL, JK Williams have done more than meet client requirements, they’ve positioned themselves to lead conversations around digital capability, audit readiness, and delivery assurance. With a structured, traceable, and auditable system purpose-built from the ground up, there’s no need to retrofit during procurement. A concept they’re advocating for with their own clients. 

Being able to sit there when you’re tendering and say to a client, ‘Hey, we can give you complete oversight of ITPs, live and as they unfold’ — that’s a huge win.

Jessica Gough
HSE Manager

For Jessica, that visibility isn’t just a feature, it’s a differentiator. When clients see SIMPEL in action, their expectations shift.

When we talk to clients and walk them through the system, their whole view changes. They love that they can peek behind the curtain and see what's happening on site.

Jessica Gough
HSE Manager

That shift has gone further than interest. For some, it’s becoming a line item in procurement.

We’ve had another client talk about potentially even adding it as either people tendering on the project must have SIMPEL or something of the equivalent value. And I’m like, well, nothing’s equivalent. Nothing matches this. So, you should just say people have to have SIMPEL.

Jessica Gough
HSE Manager

What started as a tool to improve internal operations has become a competitive edge, giving JK Williams the confidence to lead, the capability to deliver, and the opportunity to meet tender requirements before they’re even written.

‍

The Power of Easy-to-Use Software: From Zero Digital Exposure to Fully Mobile Sites

Introducing new tech is one thing. Bringing an entire team from paper-only processes to full digital operations is another. While JK Williams’ NSW staff had some experience with digital systems, JK Williams Queensland branch (formerly DAC) hadn’t used digital platforms at all. 

Queensland had only ever written on paper. Nothing was digital. They didn’t even really know digital programs like this existed. So, when we went from minimal paperwork to full digital compliance, and they were happy to do it because they could see how much easier it made things.

Jessica Gough
HSE Manager

The shift could have been a major challenge, but it wasn’t. By showing how digital workflows would make their day easier, the team got on board quickly.

We said, ‘You’re not going to need folders anymore. You’ll be able to stand in the back paddock and open drawings, forms, whatever you need, on your iPad.’ That’s what helped get them on board.

Jessica Gough
HSE Manager
Aerial view of a large construction site with earthworks and residential housing in the distance.

For site teams used to handling forms manually, the ability to pull up drawings, sign-ons, and checklists in the field made a great impression. Even those hesitant to make the leap quickly saw the value. 

We had some of the older guys whose emails were still shared with their wives. Tech just wasn’t part of their daily routine. But once we trained them up and they saw everything was just there, they got it. It didn’t take long before they preferred it over the old way.

Jessica Gough
HSE Manager

About JK Williams

JK Williams is a family business founded over 65 years ago built on a solid reputation for market distinction; it has a rich family history together with a strong heritage of quality, stability and innovative leadership.

The dark blue background and bright yellow lettering of JK Williams is instantly recognisable on the extensive and modern fleet of civil construction and transport equipment. The company, rich in tradition, and proud of reputation, is a highly respected corporate citizen of the Western Sydney area renowned for delivering innovative solutions in the civil construction sector.

Thanks to Jessica Gough and the team at JK Williams for their ongoing support and contribution to this case study.

See how you can save time by reducing repetitive admin.

Construction runs on documents, decisions and on-site execution. SIMPEL delivers all three, with its hardware as ground truth and a network that compounds with every project our clients deliver. Bolt AI runs in the background, keeping delivery focused on execution, not managing another layer of technology.

Illustrated top-down view of a tablet device surrounded by construction documents, plans, and project management icons

From design, delivery, and handover, SIMPEL brings construction operations into one connected system to turn information into action. By connecting teams onsite and in the office, it captures mission critical workflows and the rich data needed to power AI that distils meaningful intelligence.

Hand-drawn sketch of a construction site with cranes and a building under construction, overlaid with project charts and data dashboards

Reporting & Analytics supports precise, informed decision-making by automatically consolidating project and organisational data to create a live thread of interactive information.

Project Dashboards
Organisation Intelligence
OData API
Hand-drawn sketch of a warehouse facility with a delivery truck and storage shelving, representing on-site logistics and materials management

Bookings & Warehousing replaces the whiteboard, setting the rhythm of operations across resources, deliveries, and storage, keeping everything in sync from early bookings to last minute changes.

Bookings & Deliveries
Warehousing
Automated Cycles
Sketch of a full-height turnstile gate and access control barrier at a construction site entrance

SIMPEL’S proprietary site access hardware and software, developed as one cohesive system, mitigates the hazard of unknown, untrained, and non-compliant workers entering sites.

Site Access Dashboard
Zone Management
Evacuation Management
Workhour Reporting
Turnstile Gates
Vehicle Boom Gates
Tripod Turnstiles
Speed Gates
Biometric Systems
Tablet Kiosks & QR Posters
Illustration of a tablet kiosk on a stand displaying a site floor plan, with construction machinery visible in the background

Quality Management drives QA processes, using dynamic forms and workflows to manage audits, defects, and tasks, ensuring required actions are captured and addressed as they arise.

Customised QA Forms
QTrack Defecting
Inspection & Testing Plans
Task Management
Illustration of a construction worker wearing a hard hat and reviewing a tablet on a job site

This suite centralises safety processes to keep every site protected and compliant, putting the right tools in the hands of the people who need them most and supporting safe, well-coordinated worksites.

SIMPEL Passport
Workforce Compliance
Role-Based Inductions
Plant Management
RAMS
Prequalification
Safety Documents
Daily Declarations
Site Diaries
Incident Management
Visitor Management
HSE Observations
HSE Forms & Inspections
Site Notifications
Permits
CSCS Validation
Architectural sketch of a multi-storey building shown as a layered cross-section, with each floor representing a stage of construction delivery

Project Essentials centralises the core tools needed for delivery, unifying documents, data, and communications into one place so there’s always a clear view of what’s happening and what needs to be done next.

Document Management
Rapid Loops
Loopflows
BIM Viewer
Drawing Collaboration
Communication & RFIs
Tendering
EOT/Variations Registers
Information Delivery Plans
QR Docs
Workflows
Photos